Work out the all-in price per kW per month for a colocation deployment. Enter the colo rate, the facility PUE and the PPA price, and see what power adds on top. Power is treated as a pass-through at 100% of contracted load, so the result is the number you can compare across sites and operators.

Your inputs

£ /kW/month
ratio
£
MW IT load

Example values are loaded. Replace them with your own.

All-in price

£190.08
per kW per month
Colo
Power

At scale

Per MW, per month
Per MW, per year

Sensitivity to PUE

All-in = Colo + (PUE × PPA × 730)

730 is the hours in an average month (8,760 ÷ 12). Power is passed through at cost and drawn at 100% of contracted load.

Looking for colo space at this price? Submit requirements →

How the price is built

Colocation for AI and HPC is quoted in two parts: a rate for the space and infrastructure, and the cost of the power the deployment draws. Adding the two gives one figure per kW that you can compare across sites and operators.

All-in £/kW/month = Colo + (PUE × PPA £/kWh × 730)

With a colo rate of £120, a PUE of 1.2 and a PPA of £80/MWh, power adds £70.08 and the all-in price is £190.08 per kW per month.

The four inputs

Colo price

The operator’s rate for space, cooling capacity and electrical infrastructure, quoted per kW of contracted IT load per month.

PUE

Power Usage Effectiveness is total facility energy divided by IT energy. At a PUE of 1.2, every 1 kWh used by the IT equipment draws 1.2 kWh from the grid.

PPA price

The price of each unit of energy under the power purchase agreement, usually quoted per MWh. Divide by 1,000 for the per kWh figure.

730 hours

The average number of hours in a month (8,760 hours in a year divided by 12). It turns a per kWh price into a monthly cost for each kW of load.
What moves the number

Four factors that change the all-in price most.

Facility PUE

Cooling design, climate and how fully loaded the hall is set how much extra energy each IT kW draws. Use the PUE in the operator’s contract or design specification, not a headline figure.

PPA structure

Fixed, indexed and spot-linked power prices behave very differently over a contract term. The power line can move more than the colo rate.

Contracted or metered load

The calculator assumes 100% of contracted load. Where billing is on metered draw, the power line falls in proportion.

Margin and term

Some operators pass power through at cost and others add a margin. Term length and ramp schedule also move the colo rate, so compare quotes like for like.
Questions

Frequently asked questions

Short answers to the questions we hear most about pricing colocation for AI and HPC.

What is a good PUE for an AI or HPC data centre?

Modern high-density facilities typically sit between 1.1 and 1.4, depending on cooling design, climate and how fully loaded the hall is. Use the PUE in the operator’s contract or design specification.

Why is colocation priced per kW per month?

Capacity in a data centre is limited by power and cooling, not floor space. Pricing per kW of contracted IT load reflects what the operator actually provides and lets you compare sites on the same basis.

Why multiply the power price by PUE?

The PPA price covers each unit of energy. PUE tells you how many units the facility draws for every unit the IT equipment uses, so cooling and electrical losses land in the power line.

How do I convert a PPA price from £/MWh to £/kWh?

Divide by 1,000. A price of £80/MWh is £0.08/kWh. The calculator does this for you when you select /MWh.

What else can affect the final price?

Contract term, ramp schedule, connectivity, cross-connects, remote hands and any power margin or pass-through levies are agreed with the operator and sit on top of this figure.

Is this a quote?

It is an indicative figure built from the inputs you enter. Live pricing depends on the site, availability and term, so submit your requirement and we will come back with real options.
Next step

Looking for colo space?

Share your size, density, location and timeline. We match the requirement to operators with live capacity.

Need GPU capacity?

Sourcing GPUaaS or neocloud capacity for an AI or HPC workload? Start with the requirement and we find the fit.

Operator with capacity or land?

Access structured enterprise demand for your available capacity, land and power.

Looking for Colo Space?

Tell us your size, density, location and timeline and we will match you to operators with live capacity.