Resources
GPU Cluster Planner
Size an NVIDIA H200, B200, B300, GB300, Vera Rubin or Rubin Ultra deployment in MW, racks and monthly colo cost, then test whether owning in colo beats renting GPUaaS over your term. Every input is editable, so you can use your own vendor figures and quotes.
Cluster
Facility
Own or rent
Market prices are quoted in US dollars. Update the rate to today's.
Example values are loaded. Hardware and GPUaaS prices are third-party market estimates, so replace them with your own quotes.
Monthly facility cost
- Colo
- Power
Size of the deployment
- IT load
- Facility draw at PUE
- Racks
Unit costs
- All-in per kW per month
- Per GPU per month
- Per year
IT kW = GPUs × kW per GPU × (1 + overhead)
Monthly = IT kW × (colo + PUE × PPA × 730)
730 is the hours in an average month. Power is passed through at cost and drawn at 100% of IT load. GPUs differ greatly in compute between platforms, so compare costs per GPU only within a platform.
Over the term
- Owning in colo, per GPU-hourBreak-even GPUaaS rate
- GPUaaS, per GPU-hour
- Total cost of owning
- Total cost of renting
- Cash break-evenWhen rental spend passes owned spend
Cumulative cash spend
The owned line starts at the hardware purchase. Residual value and cost of capital are in the totals above, not in this chart.
View as table
Owned per GPU per month = hardware × (1 − residual) ÷ term + cost of capital + support + facility cost
GPUaaS per GPU per month = rate × 730
How the planner works
The planner has two tabs. Cluster planner turns a GPU count into IT load, racks and a monthly colo and power cost. Own or rent takes that facility cost and compares owning the hardware in colo with renting the same GPUs as a service.
IT kW = GPUs × kW per GPU × (1 + overhead)
Monthly = IT kW × (colo + PUE × PPA × 730)
Each platform preset loads rated power, rack density and a market price range for the hardware and for GPUaaS. Replace them with your supplier’s quotes.
What each step does
GPU system power
Racks and density
Facility power
Own or rent
What changes the answer
Four factors that decide own or rent.
Utilisation
Hardware price and residual value
Cost of capital
Term and refresh cycle
Questions
Frequently asked questions
Short answers to the questions we hear most about sizing and pricing GPU deployments.
How many GPUs fit in 1 MW?
What power does a GB300 NVL72 rack need?
How much power does an eight-GPU B300 server use?
Is owning in colo cheaper than GPUaaS?
What does the own or rent comparison include?
Where do the hardware and GPUaaS prices come from?
Are Vera Rubin and Rubin Ultra available?
Is this a quote?
Next step
Looking for colo space?
Need GPU capacity?
Price a colo quote
Looking for Colocation Space, hardware or Gpuaas?
Tell us your location, timeline and contract term. The planner inputs are attached to your enquiry automatically, so we can match you to operators with live capacity.