GPU Cluster Planner

Size an NVIDIA H200, B200, B300, GB300, Vera Rubin or Rubin Ultra deployment in MW, racks and monthly colo cost, then test whether owning in colo beats renting GPUaaS over your term. Every input is editable, so you can use your own vendor figures and quotes.

Cluster

GPUs
kW
% of GPU power

Facility

£ /kW/month

Example values are loaded. Hardware and GPUaaS prices are third-party market estimates, so replace them with your own quotes.

Monthly facility cost

Colo
Power

Size of the deployment

IT load
Facility draw at PUE
Racks

Unit costs

All-in per kW per month
Per GPU per month
Per year

IT kW = GPUs × kW per GPU × (1 + overhead)

Monthly = IT kW × (colo + PUE × PPA × 730)

730 is the hours in an average month. Power is passed through at cost and drawn at 100% of IT load. GPUs differ greatly in compute between platforms, so compare costs per GPU only within a platform.

Looking for colo space for this cluster? Submit requirements →

How the planner works

The planner has two tabs. Cluster planner turns a GPU count into IT load, racks and a monthly colo and power cost. Own or rent takes that facility cost and compares owning the hardware in colo with renting the same GPUs as a service.

IT kW = GPUs × kW per GPU × (1 + overhead)

Monthly = IT kW × (colo + PUE × PPA × 730)

Each platform preset loads rated power, rack density and a market price range for the hardware and for GPUaaS. Replace them with your supplier’s quotes.

What each step does

GPU system power

Rated power per GPU from NVIDIA specifications or third-party rack estimates, plus an overhead for networking, storage and management. Pick a platform to load a starting point, then overwrite it with your supplier’s figure.

Racks and density

GPUs divided by GPUs per rack gives the rack count. IT load divided by racks gives the average density, which tells you whether a site’s cooling can take it.

Facility power

Colo is charged on IT kW. Power is charged on facility energy, so PUE multiplies the energy cost. Both are treated as pass-through with no margin.

Own or rent

Spreads hardware cost, cost of capital, support and facility cost over the term and compares the result with the GPUaaS hourly rate. It also shows the month when cumulative rental spend passes owned spend.
What changes the answer

Four factors that decide own or rent.

Utilisation

Reserved GPUaaS bills every hour of the term. Owned hardware costs the same whether it is busy or idle, so sustained use favours owning.

Hardware price and residual value

Purchase price, delivery lead times and what the GPUs are worth at the end of the term usually move the owned cost more than the facility inputs do.

Cost of capital

Money tied up in hardware has a cost. A higher rate pushes the break-even later and narrows the gap to renting.

Term and refresh cycle

A short term gives owned hardware less time to pay back. A new GPU generation can also change the value of what you hold.
Questions

Frequently asked questions

Short answers to the questions we hear most about sizing and pricing GPU deployments.

How many GPUs fit in 1 MW?

It depends on the platform. On rack-scale Blackwell Ultra systems rated at up to about 140 kW per rack for 72 GPUs, 1 MW of IT load holds roughly 450 to 500 GPUs once networking and storage overhead is included. If the 1 MW is the grid supply to the whole facility, divide by the PUE first.

What power does a GB300 NVL72 rack need?

Vendor specifications list up to about 140 kW per rack for 72 GPUs. Check the exact figure for your supplier and cooling design, then enter it in the planner.

How much power does an eight-GPU B300 server use?

NVIDIA lists its DGX B300 at about 14.5 kW, with a 15 kW system maximum, for eight GPUs. Other vendors’ B300 servers vary, so use your supplier’s rated figure.

Is owning in colo cheaper than GPUaaS?

It depends on the hardware price, the term, how busy the GPUs stay and the GPUaaS rate on offer. Owning tends to win when demand is sustained and predictable over several years. Renting tends to win when demand is short or uncertain. The Own or rent tab shows the break-even rate and the month spend crosses over.

What does the own or rent comparison include?

Owned cost includes the hardware price less residual value, cost of capital, support and maintenance, and the facility cost (colo and power) from the first tab. GPUaaS is the hourly rate multiplied by 730 hours a month, billed for every hour of the term.

Where do the hardware and GPUaaS prices come from?

NVIDIA and its system builders do not publish list prices, so the presets use third-party market estimates for 2026 and show the range beside each field. Prices differ widely by platform, volume and supplier, and the exchange rate is editable. Replace them with a quote.

Are Vera Rubin and Rubin Ultra available?

Vera Rubin NVL72 systems are expected to ship from the second half of 2026 in limited volume. Rubin Ultra is not shipping yet, with NVIDIA pointing to the second half of 2027 and one report to 2028. Their figures are planning estimates and will change.

Is this a quote?

No. It is an indicative figure built from the inputs you enter. Live pricing depends on the site, availability and term, so submit your requirement and we will come back with real options.
Next step

Looking for colo space?

Share your size, density, location and timeline. We match the requirement to operators with live capacity.

Need GPU capacity?

Sourcing GPUaaS or neocloud capacity for an AI or HPC workload? Start with the requirement and we find the fit.

Price a colo quote

Turn a colo rate, PUE and PPA price into one all-in price per kW per month.