Guide
How to Choose a Data Centre Broker
A good data centre broker saves you months and gets you capacity you would not have found alone. A poor one sends you the same three quotes you could have had by phoning the providers. The difference is rarely in the sales pitch, so the questions below are the ones that show it.
What a Data Centre Broker Does
A data centre broker helps a buyer find and secure capacity: colocation space, power and, increasingly, high-density or GPU-ready halls. They take your requirement, work out which providers can meet it, introduce you and support the process through to contract.
The introduction is the easy part. The value is in knowing who has capacity that can be energised on your timeline, and which details in your requirement rule options in or out early.
What a Broker Is Not
Not the operator
A broker does not own or run the facilities you end up in.
No price guarantee
A broker can compare and negotiate, but the provider sets the price.
Not carrying your risk
An introducer does not take on the operational risk of your deployment. Check which role yours plays.
How Brokers Are Paid
Three ways a broker earns, and why it matters.
Who pays the broker shapes who they work for in practice. Most data centre brokers work on the first model.
Provider commission
Who pays: The provider pays when a deal is signed.
Watch for: The buyer pays nothing. Check that commission does not differ between providers in a way that steers you.
Buyer fee
Who pays: The buyer pays a retainer or success fee.
Watch for: Agree it in writing before work starts, and ask whether the broker also takes commission from the provider.
Reseller margin
Who pays: The buyer pays, through a margin on the price.
Watch for: The broker holds your contract and adds its own margin. That is a different relationship from an introduction.
Do You Need a Broker?
A broker earns its place when the requirement is large, urgent or awkward: more than a few racks, high power density, liquid cooling, several locations, or a power date that matters more than the price.
It also helps when you do not know who has real capacity. Supply that is listed and supply that can be energised on your timeline are often not the same.
Broker or Direct?
Use a broker when
The requirement is large, dense, multi-site or urgent, or you cannot tell whose capacity is real.
Go direct when
You want a single retail rack, a small colocation footprint, a facility you have already chosen, or a renewal.
Eight Questions
What to ask before you choose a broker.
Put these to every broker you speak to. Each one shows what a good answer sounds like and what should make you cautious.
Who pays you, and how?
Most brokers are paid commission by the provider, so the service costs you nothing. Ask for that in writing, and ask whether commission differs between providers.
A good answer
The provider pays us when you sign. You pay nothing, and I will put that in writing.
Be cautious if
It is all included, or an answer that changes when you name specific providers.
Which providers can you place me with, and which can you not?
A broker tied to a handful of providers will show you the same handful every time. Ask how many they work with in each of your target locations.
A good answer
A straight account of where coverage is strong and where it is thin.
Be cautious if
A claim to cover everyone, everywhere.
Is my size and workload something you handle?
Retail colocation, wholesale halls and high-density GPU deployments are different markets with different suppliers. Ask for examples like yours, without client names.
A good answer
Comparable requirements by size, density and cooling, and a plain no when yours is outside what they do.
Be cautious if
Yes to everything, with no examples.
How current is your capacity information?
Listings go stale, and some advertised capacity is not yet built. Ask when availability was last confirmed with each provider they propose.
A good answer
They separate available now, committed for later and speculative, with dates.
Be cautious if
A spreadsheet of sites with no dates.
Will you advise on power, not only space?
For most requirements the constraint is the grid connection and energisation date, not floor area. Ask how they test a stated date.
A good answer
They ask about MW, density, ramp and required date before talking price.
Be cautious if
They quote a price per kW straight away.
Who do I contract with, and what happens after signing?
You should contract directly with the provider. A broker that takes your payments or contracts in its own name is a reseller. Ask what support continues through handover.
A good answer
You contract with the provider. We stay involved through review and handover.
Be cautious if
They ask you to pay them, or sign with them, for the capacity.
How do you handle confidentiality?
Providers often ask who the end client is, and some information is released only under an NDA. Ask how your identity is protected until you are ready.
A good answer
They sign an NDA first and agree with you when your name is disclosed.
Be cautious if
Your requirement goes out under your company name on first contact.
What have you actually completed?
Ask for the type, size and region of recent deals, and a reference. Brokers who cannot name clients can still describe deals in outline.
A good answer
Recent deals by type, size and region, plus an offer of a reference.
Be cautious if
Everything is confidential and nothing can be described.
Red Flags
“A broker who will not tell you how they are paid is already telling you something.”
Price before questions. A broker who has not asked about power, density, timing and term is guessing.
One or two providers. If they cannot say why those two, the shortlist reflects their arrangements, not your needs.
Opaque fees. A fair arrangement can be explained in a sentence.
Neutral in name only. Neutral is a claim about incentives, and incentives come from who pays.
Unchecked dates. A date the provider has not confirmed is a hope, not a plan.
Broker, Advisor, Reseller or Direct
Judge a firm by how it is paid, not what it calls itself.
Broker or introducer
Paid by: Provider commission
You contract with: The provider
Suits you when: You want access and process support for a defined requirement.
Advisor or consultant
Paid by: A fee from the buyer
You contract with: The provider, separately from the advisor
Suits you when: You want independent strategy, specification or evaluation and will pay for it.
Reseller or marketplace
Paid by: A margin on the capacity
You contract with: The reseller
Suits you when: You want one invoice and accept a middleman in the contract.
Going direct
Paid by: Not applicable
You contract with: The provider
Suits you when: The facility is known and the requirement is simple.
For advice separate from any commercial deal, read what a data centre advisor does and how a data centre consultant differs.
How the Process Runs
Six stages a good broker takes you through.
The timeline depends mostly on whether the capacity exists today or has to be built and energised.
Brief
Agree the requirement: power, density, cooling, locations, term and the date you need it by.
Market sounding
The broker checks which providers could meet it and confirms current availability, not just listings.
Shortlist and visits
You see a short list with reasons, then visit the sites that remain.
Proposals
Providers respond commercially. Compare them like for like, including power terms and the date.
Negotiation
Heads of terms cover price, term, growth rights and what happens if the power date slips.
Contract and handover
You contract directly with the provider. A good broker stays involved through handover.
What to Prepare Before You Contact a Broker
A rough answer to each of these is enough to start, and a good broker will help you firm up the rest.
Your Starting Brief
Power needed, in MW, and by when. These two facts decide which options are realistic.
Preferred locations, and how flexible. Flexibility widens supply and can bring a date forward.
Rack density and cooling, air or liquid. This decides which providers can host you at all.
Contract term and growth rights. Growth rights are easier to secure at the start.
Security, certification and connectivity. State them early rather than lose a shortlisted site on them.
How Armason Works
Armason introduces buyers to data centre capacity in the UK, Europe and other markets, with a focus on high-density, HPC and GPU-ready requirements. We also help with power, land and funding introductions where a requirement needs them.
Because providers pay us, you should ask us the same eight questions. We will answer them.
How We Are Set Up
How we are paid
The provider pays us commission. We do not take payments from you.
Who you contract with
The provider, directly. We do not contract on your behalf.
Our status
We are an introducer. Armason is not authorised or regulated by the Financial Conduct Authority and does not give debt or investment advice.
FAQ
Frequently Asked Questions
Short answers to what buyers ask most about using a data centre broker. Anything else, send us your requirement and we will answer it directly.
Usually not. The provider pays a commission when a deal is signed, as explained in our guide to whether data centre brokerage is free and how brokers are paid, but confirm this in writing before you start and check there is no retainer or success fee on your side.
You can, but for the same requirement it often causes confusion, because providers generally register one broker per deal. Ask each broker how they register your requirement and with whom.
A provider shows you its own capacity. A broker can compare several, tell you where capacity is committed or constrained, and manage the process. The trade-off is that the broker is paid by the provider, so ask the questions above.
Your power need and timing. Those two facts decide which options are realistic.
It depends mainly on whether the capacity is live or still to be built and energised. Live capacity can move much faster. Capacity waiting on power or construction takes longer, and the date is usually set by the grid connection.
A good one should. For most requirements the grid connection and energisation date are the constraint, so a broker who only talks about floor space is missing the main question.
Send Us Your Requirements
Tell us your power need, timing and preferred locations. A rough brief is enough to start, and we will come back with a clear view of the options.