Data Centre Colocation

Data Centre Colocation

Colocation is the practice of housing your own servers and computing hardware in a third-party data centre facility. The operator provides the building, power, cooling, physical security, and connectivity infrastructure. You retain ownership and control of your equipment. For enterprise organisations, colocation sits between building your own data centre — expensive, slow, and capital-intensive — and public cloud, which lacks the control, cost predictability, and compliance documentation that many workloads require. In 2026, colocation has become the default infrastructure model for enterprise IT at scale.

What is Data Centre Colocation?

In a colocation arrangement, an enterprise organisation rents space — typically measured in racks, cabinets, cages, or suites — within a data centre operated by a third party. The colocation provider supplies the physical infrastructure: the building, redundant power systems, cooling plant, physical security, and network connectivity. The enterprise brings its own servers, storage, and networking equipment, installs it within the rented space, and connects to the facility’s power and network infrastructure.

This model gives enterprises the operational characteristics of a private data centre — dedicated hardware, predictable performance, physical control, regulatory compliance documentation — without the capital expenditure and operational complexity of building and running a facility themselves. It also provides access to connectivity infrastructure — cross-connects, internet exchanges, cloud on-ramps — that would be impossible to replicate in a private facility.

Colocation exists on a spectrum from retail colocation — individual cabinets or small cages rented by smaller enterprises — to wholesale colocation, where large enterprises or hyperscalers lease entire data halls or multi-megawatt power blocks on long-term contracts. Armason operates exclusively at the enterprise and wholesale end of this spectrum, working with organisations requiring 1MW or more of capacity.

Colocation vs. the Alternatives

vs. Public Cloud — Colocation offers cost predictability and compliance control that public cloud cannot match for stable, high-volume workloads. Enterprises running consistent compute loads at scale typically find colocation materially cheaper than equivalent cloud spend over a three to five year horizon. Control over hardware, software stack, and compliance documentation is complete.

vs. Private Data Centre — Building your own data centre requires capital expenditure in the tens to hundreds of millions, takes three to five years to deliver at meaningful scale, and creates an ongoing operational burden. Colocation delivers comparable control at a fraction of the capital cost and on a timeline measured in months rather than years.

vs. Managed Hosting — Managed hosting providers own the hardware. In colocation, you own the hardware. This distinction matters for total cost of ownership at scale, for compliance and audit requirements, and for organisations whose hardware specifications exceed what managed providers standardly offer.

Types of Colocation

Retail, wholesale, and everything between.

Retail Colocation

Individual cabinets or small cages rented within a shared data centre environment. Typically priced per cabinet or per unit of power. Appropriate for smaller deployments or organisations testing a colocation strategy. High-density retail colocation — supporting GPU clusters or AI inference workloads — is a growing segment where cabinet-level pricing can reach multiples of standard retail rates due to the power and cooling infrastructure required.

Wholesale Colocation

Dedicated data halls or multi-megawatt power blocks leased by large enterprises or hyperscalers on long-term contracts. Wholesale colocation typically starts at 1MW and extends to tens or hundreds of megawatts. Pricing is negotiated directly with operators and is substantially lower per unit than retail. Contracts typically run five to fifteen years with fixed or indexed pricing. This is the segment Armason operates in.

Build-to-Suit

Operators construct a facility to the enterprise buyer’s exact specification, typically on the buyer’s preferred site or within the operator’s development pipeline. Build-to-suit arrangements provide the highest degree of customisation — bespoke power, cooling, density, and redundancy — but require the longest lead times and the highest commercial commitment. Armason works with operators to bring forward build-to-suit timelines where standard pipeline delivery is too slow for the buyer’s requirement.

What to Look for in a Colocation Provider

Not all colocation providers are equal — the gap between operators that can genuinely deliver and those that cannot is wider than at any point in the market’s history. The combination of power scarcity, AI-driven density requirements, and extended build timelines means that choosing the wrong provider introduces delays and costs that can be severe.

Power availability and reliability is the first filter. An operator’s stated capacity means nothing if the power infrastructure supporting it is constrained, unreliable, or dependent on a grid connection that may not materialise on the projected timeline. Tier rating provides a framework but does not substitute for facility-level due diligence on actual power infrastructure and redundancy architecture.

Connectivity depth matters for most enterprise workloads. The number of carriers present in the facility, access to internet exchanges, and the availability of direct cloud on-ramps to AWS, Azure, and Google Cloud all affect the operational performance and commercial efficiency of a colocation deployment. Carrier-neutral facilities — where no single network provider has commercial advantage — are generally preferred.

Commercial terms require careful scrutiny. Contract length, power pricing structures, escalation mechanisms, exit provisions, and SLA definitions all have significant financial implications over a five to ten year contract. Armason structures and reviews these terms as part of every engagement, ensuring that what looks like a competitive headline rate does not carry embedded costs that erode the advantage over time.

If you are comparing brokers to help you choose, our guide sets out what to ask a data centre broker before you decide.

Key Evaluation Criteria

Power redundancy — N+1, 2N, or 2N+1 configurations. The right level depends on the criticality of your workload. Higher redundancy means higher cost — match the specification to the actual requirement.

Cooling infrastructure — standard air cooling, hot/cold aisle containment, rear-door heat exchangers, or liquid cooling. AI and HPC workloads require liquid or hybrid cooling at rack densities that most standard facilities cannot support.

Physical security — CCTV, biometric access, man-trap entry, on-site security personnel. ISO 27001 certification provides a baseline but the specific controls vary significantly between operators.

Connectivity — number of carriers, internet exchange access, cloud on-ramps, dark fibre availability, cross-connect pricing.

Compliance certifications — ISO 27001, PCI DSS, SOC 2, HIPAA-ready designation. Critical for regulated workloads and those with audit requirements.

SLA structure — power uptime guarantees, cooling uptime, network availability, and the commercial consequences of SLA breach. The gap between a 99.9% and 99.999% uptime guarantee is significant in terms of both facility infrastructure and financial exposure.

How Armason Sources Colocation Capacity

Armason is not a colocation provider. We are a neutral advisory that structures enterprise requirements and matches them to operators capable of delivering — with no commercial bias towards any operator or any technology. Every engagement starts with a structured brief that captures power requirement, density specification, redundancy needs, connectivity requirements, geographic constraints, compliance obligations, and commercial parameters. This brief is then used to engage operators directly, manage proposals, and provide a clear, comparable evaluation of options.

This approach differs materially from the alternatives. Operators’ own sales teams represent their own interests. Marketplaces and listing platforms provide access but not alignment — buyers receive inconsistent proposals and must manage evaluation themselves. Armason removes this friction by acting as the structured intermediary that neither model provides. The result is faster procurement, better-aligned proposals, and contracts that reflect the buyer’s actual requirements rather than the operator’s standard commercial terms.

For enterprise organisations sourcing AI and HPC colocation, enterprise compute capacity, regulated environment infrastructure, or flexible SaaS infrastructure, Armason provides the structured process that makes a complex market navigable.

Data Centre UK

The UK colocation market — where capacity exists, where it doesn’t, and how Armason operates across all regions.

Data Centre Cost

What colocation actually costs — pricing structures, market rates, and commercial terms explained.

Data Centre Procurement

How to structure and run a colocation procurement process that delivers the right outcome.

Data Centre Managed Services

End-to-end development management — land, power, construction, MEP fit-out and GPU deployment coordinated as a single programme.

Discuss Your Colocation Requirement

Tell us what you need and we’ll identify the right operators, the right locations, and the right commercial structure. We don’t provide generic introductions — just a structured conversation about your specific requirement.