This week in UK data centres:
- Compare the Cloud’s guide to what a 500MW AI data centre means for local suppliers makes the point the market keeps relearning: a headline megawatt figure is a potential pipeline of work, not guaranteed revenue. Ofgem’s contracted demand offers rose from 41GW to 125GW in seven months, with at least 80GW attributed to data centres
- Eclipse Power argues in Data Centre Review that more than 100GW of the queue cannot connect before 2030, and that developers are already routing around it with private networks, co-located generation and phased connections
- Opposition is hardening on three fronts: Leeds has approved Microsoft’s £4bn Skelton Grange scheme against a petition of more than 44,000 signatures, the Green Party wants data centres stripped of automatic critical infrastructure status, and Regen and CPRE both want the power question answered at planning stage
A 500MW headline is a pipeline, not revenue.
Compare the Cloud’s guide for local suppliers starts from a definition that gets lost in most announcements. Megawatts measure power capacity, not annual electricity use, computing performance, bandwidth or contract value, so a 500MW figure could mean a grid connection request, the eventual full campus, or IT power. Its advice is to ask which of those it is, and what the first funded phase covers.
The queue is the reason that question matters. Ofgem’s contracted demand offers reportedly rose from 41GW in November 2024 to 125GW in June 2025, and Ofgem’s July 2026 material attributes at least 80GW of that to data centres while warning that some may never proceed. The guide also flags that delays are real: Ofgem’s December 2025 review reported some developers facing delays of years beyond their connection offers, so the practical advice is to settle who bears postponement costs before reserving labour or ordering equipment.
The pipeline counts show how much depends on definition. One regional count has 119 data centres totalling around 8GW in planning or under construction, while a separate September analysis counts 173 projects and more than 14.6GW in planning but not yet built. Proposed projects collectively request around 50GW of grid capacity, and Addleshaw Goddard counts 315 data centre projects inside the demand queue. These are different measures of different things, and they cannot be added together.
The smaller end of the market looks more deliverable. The guide cites Savills’ H1 2026 research suggesting that inference workloads could support incremental deployments of 5MW to 20MW, which suits regional suppliers and operators with existing connections. For anyone sourcing capacity or selling into a project, the useful questions are the same: who is the named buyer, what is the first funded phase, and what is the next milestone.
Sources: What a 500 MW AI data centre means for local suppliers (Compare the Cloud) | New data centres in the UK: 2026 pipeline (Data Centre Axis)
Eclipse Power: the queue, the fee and the routes around both.
Charles Deacon of Eclipse Power uses the same queue figures to argue that the UK’s AI ambitions are at risk. Transmission-connected demand in the queue rose from 17GW to 97GW between November 2024 and June 2025, and his own estimate is that more than 100GW cannot connect before 2030, with a new application taking up to 15 years. He adds that the average transmission demand residual charge rose by about 64% in a year, and he links the pause of OpenAI’s Stargate UK project to energy prices and grid delay.
On Ofgem’s proposed fix he is supportive with a caveat. The Data Centre Commitment Fee of £237,500 to £712,500 per MW, roughly 2.5% to 7.5% of average project costs, would be paid on accepting a connection offer, refunded at energisation and forfeited if the project leaves the queue early. Responses closed on 16 September. Deacon sees it as a useful filter on speculative applications but thinks the starting level may be far too high.
His routes around the queue are the ones developers are already using. Private networks and co-located generation behind a single meter can offer faster power and possibly lower transmission costs. Smaller connections are often easier to secure and may need less reinforcement, particularly at brownfield sites. Phased ramp-ups sized to demand can bring forward initial energisation. He also expects the Connect pillar of Ofgem and DESNZ’s demand connections reform to introduce self-build, own or transfer options, and possibly independent transmission operators.
He is also direct about AI Growth Zones: they bring planning support and a policy signal, and possibly network charge discounts, but they still depend on network capacity, and zones are being announced without a clear view of how much demand local grids can support.
Sources: Can the UK power its data centre ambitions? (Data Centre Review) | Ofgem acts to free up grid capacity by tackling speculative data centre projects (Ofgem)
From Holyrood to Leeds, opposition is moving to power, water and land.
In Scotland, Parliament backed a pause on planning decisions for new hyperscale AI data centres of up to 12 months while national guidance is developed, with tougher environmental assessment required first. From 17 September, applications over 50MW require a full EIA, and Armason’s tracking shows 14 committed schemes and 2.4GW now in a holding pattern. The pause is due to end with national guidance at the end of 2026.
In England, the pressure is arriving through individual consents. Leeds City Council has granted planning permission for Microsoft’s £4bn data centre complex on the former Skelton Grange power station site, three data centre buildings plus a warehouse of up to 161,000 sq ft, and more than 44,000 people have signed a petition against it. West Yorkshire Mayor Tracy Brabin defends the scheme on economic grounds, while the Green group leader on Leeds council has raised water and energy concerns and argued that more gas will be burned to supply it. Skelton Grange is a brownfield site on a former power station, which is the profile planners and campaigners say they want. It was still contested.
The Green Party’s position at national level sets out where that opposition wants to go. In a late August release it called for data centres to lose their automatic classification as critical infrastructure, for tighter planning rules and full community consultation, for new sites directed to brownfield land near renewable energy hubs, and for audited annual water and electricity figures. CPRE is arguing from the land side. It calls for a pause on unchecked development, a brownfield-first policy with strong enforcement, and transparency on water and energy use, and says at least 100 data centres are in the pipeline with no government body tracking them.
The common thread is disclosure. Whatever the politics, the asks from Holyrood, Leeds, the Green Party and CPRE all converge on the same requirement: say how the site is powered, cooled and supplied with water before permission is granted.
Sources: Scotland delays new AI datacentre approvals for up to a year (Computing) | Mayor defends £4bn Microsoft data centre plans (Yorkshire Evening Post) | The Green party calls for tighter rules on UK data centers (W.Media) | Data centres (CPRE) | New data centres in the UK: 2026 pipeline (Data Centre Axis)
Regen puts a number on the gas question.
Regen’s assessment of low-carbon options is the most concrete contribution this week to that disclosure argument. A theoretical 1GW gas-fired data centre could emit 2.7 to 5.7 million tonnes of CO2 a year, and under high load assumptions a reciprocating engine set-up would be more than five times as carbon-intensive as average grid electricity. The planning evidence is thinner than the policy debate assumes. Of 152 UK data centre applications reviewed, only 13% mention on-site generation and only 9% state a network connection type.
Its options are ranked from the most direct route to clean power: co-location with renewables over private wire, on-site generation, clean power contracts backed by new generation and hourly matching, storage, flexible connections, heat recovery and clean backup. Rooftop solar is a useful supplement but limited: for a 200MW site Regen estimates about 9.5MW, meeting roughly 1% of annual demand. A London trial showed a data centre cutting demand by 40% on instruction while critical workloads kept running, but data centres have been reluctant to accept flexible connections, which may push some towards gas backup.
Regen recommends mandatory disclosure of power supply in planning applications, a moratorium on new data centres that plan gas as their primary power source, and accelerated low-carbon connection routes so that developers do not turn to gas simply to get faster power. The last point connects back to the queue: if the compliant route to power takes 15 years, the incentive to build a gas bridge is built into the system.
Sources: Exploring the options for low-carbon data centres (Regen)
The week in one line: the numbers behind UK data centre announcements are being tested from every direction, with the grid queue exposing which headline megawatts can actually connect, opposition from Holyrood to Leeds demanding disclosure of how sites are powered and cooled, and Regen showing how few planning applications currently say.
Armason tracks infrastructure signals across the UK and European data centre market. For site availability, grid intelligence, or pipeline advisory, visit armason.co.uk.
Related reading
· UK Data Centre Intelligence: Week Commencing 28 September 2026
· Data centre grid connection in the UK: timelines, queues and what operators need to know
· Why most UK data centre pipelines fail before they complete


