Insights/Article

Data centre anchor tenant sourcing in the UK: how committed demand changes the economics of a new site

Aerial view of an industrial building with rooftop solar panels

Capacity under construction in the UK is being sold before it exists. Of the c.66MW of UK capacity scheduled to complete between Q2 and Q4 2026, 96% is already pre-sold, with under 3MW left to transact, and just over half of the 37MW scheduled for 2027 has already been taken up. Savills records 257MW of capacity pre-sold from future projects in 2024 alone and describes pre-letting as a core feature of the market.

For anyone bringing a new site to market, that changes the question. It is no longer whether demand exists in the UK. It is whether a specific site can show committed demand early enough to be funded, built and energised in the window that tenants are willing to wait for. An anchor tenant is the mechanism that answers it. This article covers what an anchor tenant is, how committed demand changes debt, equity and build economics, why power sits underneath all of it, and how to source an anchor before planning is determined.

What an anchor tenant is, and what it is not

An anchor tenant is a customer whose committed capacity underwrites the development. The commitment is the point: a signed lease for defined capacity over a defined term, not an expression of interest. The structure varies. In a single-tenant take-or-pay structure, one tenant contracts the whole facility, usually for 10 to 15 years, and pays for reserved capacity whether or not it uses the power, which moves demand risk to the tenant. In a multi-tenant colocation model, the developer leases capacity piece by piece and keeps the lease-up risk, even though counterparty risk is spread across more customers.

Lenders do not treat all demand evidence equally. One broker’s UK development finance guide says speculative schemes, particularly outside London, need demand evidence such as customer letters of intent or pipeline data, while pre-let schemes get the highest loan-to-cost and the lowest pricing. That guide is a broker’s marketing document, so its figures are indicative rather than lender criteria, but the hierarchy it describes is a useful one. A letter of intent can support a conversation about speculative funding. It does not make a scheme pre-let.

Why committed demand changes the economics

Debt and equity

The same broker guide puts senior development debt at 60% to 70% of cost, with pre-let hyperscale projects reaching 70% and speculative schemes at the bottom of the range, where sponsor equity is often 35% to 45%. Those are indicative figures, but the direction matches what law firms describe. Norton Rose Fulbright notes that offtake contracts are the sole source of income of a data centre project, which is why lenders treat them as critical, and that sponsors typically contribute 20% to 30% of total spend as equity.

Coverage requirements move with the contract. GI Advisors reports that hyperscale project-finance builds typically need debt service cover ratios of about 1.05x to 1.25x, while colocation builds typically need about 1.25x or higher to cover lease-up and occupancy risk. A committed anchor does not only raise the debt available. It lowers the return the lender needs the asset to show.

Tenant credit and lender protections

Committed demand is only as good as the counterparty. Offtakers are often local subsidiaries that may not be creditworthy enough for lenders, who then seek a keep well letter from the parent company or accept mitigating structures, though not all hyperscalers agree to this. Lenders also look at whether the tenant will sign a non-disturbance and step-in agreement, under which the tenant agrees not to terminate without prior notice and gives lenders the right to remedy issues, which some hyperscalers refuse. These points are best settled when the lease is being negotiated, not when the facility is being financed.

Speed

What an anchor tenant is buying, above all, is time. CoreWeave’s Ben Richardson says speed is the main reason the company leases capacity in the UK rather than building, estimating that building from scratch “might take you two to two and a half, three years”, and calls speed “one of the greatest currencies, if not the greatest currency” in the AI market. A new site competes on something the existing stock cannot offer, which is scale on a defined timeline, and committed demand is what allows a developer to fund that timeline.

The constraint under the anchor is power

An anchor tenant does not solve the power problem. It depends on it. The broker guide is blunt that lenders will not commit a facility without firm contracted power, and that planning consent is necessary but not sufficient.

The scale of the constraint is visible in the queue. Savills puts connection requests in the NESO queue at around 125GW against around 75GW of UK grid capacity, with around 11GW of demand capacity allocated for connection before 2030. Under the reformed rules, land control evidence, including multi-year option agreements, is required for Gate 2 status, and application windows are unlikely to reopen before late 2026.

Ofgem’s proposals point the same way. Its consultation would require data centre projects to show progress on financial capability, commercial maturity and procurement to keep their queue position, alongside a commitment fee of £237,500 to £712,500 per MW. Commercial maturity is not defined in the press release, but a signed anchor tenant is the most direct evidence of it a developer can offer.

The market is already sorting projects this way. Reuters reported that only 7% of 61 tracked UK projects are being built or completed, against 46% in Germany and 40% in France, and quoted Equinix’s UK managing director arguing that buying a site with both outline planning and a confirmed grid connection “removes the risk”. Power without an anchor is unfunded. An anchor without power is conditional. A new site needs both, and the order in which they are secured matters.

Sourcing an anchor tenant before planning is determined

Waiting for consent before approaching tenants is the common sequencing error. Tenants plan capacity well ahead of delivery, and a developer who approaches them after consent is competing with sites that approached them a year earlier. Savills notes that pricing stays aggressive where power, site control and a planning route are secure, and those are the three things a tenant will test first.

What a tenant needs to see

A credible approach covers a short list. The grid position: whether an offer exists, who holds it, the capacity in MVA and the energisation date. The planning route: a local authority application, an opt-in to the Nationally Significant Infrastructure Projects regime, or AI Growth Zone designation. The phasing: what the first phase delivers and when. The specification: density, cooling and resilience, since most institutional tenants require concurrent maintainability, Uptime Tier III, before signing a lease, verified by an independent third party. And the location: CBRE notes that new capacity is moving to areas with more available power, including North London, Oxfordshire, Hertfordshire, Docklands and Essex, because the established Slough and Hayes and Park Royal clusters are power limited.

Who the tenants are

Demand comes from hyperscalers, neoclouds and enterprises, and CBRE expects supply growth and high take-up to continue, driven by hyperscalers and neoclouds. Recent UK activity shows the range. CoreWeave operates leased capacity in London Docklands and Crawley and is partnering with DataVita in Lanarkshire. Bloomberg reported in April that Google is taking capacity at an Nscale facility in West London, although the capacity involved was not stated and neither company had commented at the time. The common thread is that tenants are moving quickly and are choosing between sites on the strength of a delivery date.

Staging the commitment

In practice, commitment arrives in stages, and each stage should be tied to a milestone the developer controls. Heads of terms establish the commercial basis. A conditional pre-lease or option to lease fixes capacity and price subject to conditions, typically planning consent and grid energisation by defined long-stop dates. An unconditional lease follows once those conditions are met. The long-stop dates matter as much as the headline terms, because delays push up debt carrying costs and can breach pre-lease milestone covenants. Every deal differs, and the structure should be agreed with legal advisers early.

What investors see in committed demand

The same logic applies to equity. BCLP notes that programmatic joint ventures may set pre-leasing requirements as investment criteria. And Savills reports strong demand from core income capital for stabilised assets with long leases, high occupancy and strong counterparties. A development that starts with a long lease to a strong counterparty is, from the first day, shaped like the asset that institutional capital wants to own.

Where anchor strategies fail

The first failure is a tenant signed against a power date that then slips. The lease is only as firm as the connection behind it, and Reuters reports that about a third of the power offered to one London project was pushed back by more than a decade. A date that is not firm is not a date.

The second is treating non-binding interest as commitment. A pipeline of letters of intent supports a lender conversation but, on the broker guide’s own hierarchy, does not earn pre-let terms.

The third is asking one tenant to commit to a whole campus. Compare the Cloud tells suppliers to ask what the first funded phase covers and not to commit capacity until there is a named buyer and a defined next milestone. The same test is a useful one for developers to apply to their own scheme. A first phase with a named tenant is more fundable than a headline megawatt figure.

The fourth is sequence. A developer who optioned the land, filed for planning and committed capital before assessing the power position, and only then went looking for a tenant, has reversed the order that works.

The sequence that works is consistent. Confirm the power position first. Identify the planning route. Have an anchor tenant in heads of terms before planning is determined. Structure the funding around a conditional pre-lease. Each step makes the next one cheaper.

Armason: neutral introductions between sites and demand

Armason sits between the supply and demand sides of the UK data centre market without a bias towards either. We track which sites have the power and planning position to support committed demand, and which tenants are actively sourcing capacity, and we introduce the two. If you are bringing a site to market and want to understand how tenants will read it, contact the Armason team.

Related reading

· Data centre site selection in the UK: the new sequence in a power-first market

· Why most UK data centre pipelines fail before they complete

· Data centre grid connection in the UK: timelines, queues and what operators need to know

· Ofgem first ready first connected: what the grid queue reform means for data centre developers

Sources referenced in this article

· UK data centres 2026 spotlight: building capacity (Savills)

· Lender considerations on data centre financings in Europe (Norton Rose Fulbright)

· UK data centre development finance guide 2026 (FD Commercial)

· Data centre project finance, commercial structuring, power constraints and bankability (GI Advisors)

· UK real estate market outlook 2026: data centres (CBRE)

· Ofgem acts to free up grid capacity by tackling speculative data centre projects (Ofgem)

· “Speed” reason CoreWeave leasing data centre space in UK, says European boss (Tech.eu)

· Google takes up capacity at Nscale data center in West London, UK report (Data Center Dynamics)

· Powered land and zombie projects: real estate in the age of AI (Reuters, via Stockopedia)

· The rise of strategic joint ventures and alternative structures in data centre investment (BCLP)

· What a 500 MW AI data centre means for local suppliers (Compare the Cloud)

Related Insights
Work With Armason

If you’re sourcing data centre capacity or delivering it, we can help structure the engagement.

MI Roundup

Weekly market intelligence, every Monday.